Est. 2023 · 3rd generation Free in-home estimates Same-day callbacks Central Florida & Jacksonville Open 8 AM – 6 PM
Burden ConstructionRemodeling & Flooring
  1. Home
  2. Services
  3. Remodeling

The kitchen you cook in, not the one that came with the house.

Kitchens, open layouts and whole-home remodels across Greater Orlando.

Remodeled white kitchen with a large island and pendant lights
6w
Kitchen, Lake MaryDemo to walkthrough in six weeks
Quick answer

What does a Burden remodel include?

Design help, demo, framing, electrical and plumbing coordination, cabinets, counters, tile, flooring and paint, managed by one crew with one point of contact.

What we remodel

Pick a project. Or all of them.

How it goes

Five steps, no surprises.

Open kitchen and dining space after a remodel
  1. Free in-home estimateWe measure, talk options, send a written scope.
  2. Selections firstCabinets, counters and tile are picked and ordered before demo.
  3. Demo and rough-inWalls, plumbing, electrical. The loud week.
  4. Install and finishCabinets, counters, tile, floors, paint.
  5. WalkthroughYou check every drawer. We fix the list.
A typical kitchen

Six weeks, week by week.

Bigger jobs stretch. The order stays the same.

Week 1DemoDust walls up, old kitchen out
Week 2Rough-inPlumbing, electrical, inspection
Week 3Drywall and floorsPatched, painted, floor down
Week 4CabinetsSet, leveled, counter template
Week 5Counters and tileBacksplash and lighting
Week 6Punch listHardware, touch-ups, done
Florida specifics

Built for block walls and slab floors.

Block exterior wallsElectrical runs are planned around them, not through them.
Slab on gradeMoving a sink means cutting the slab. We quote it up front.
HOA and permitsExterior changes get HOA approval first. We help with the paperwork.
Remodel FAQ

Quick answers.

Something else? Call or text.

(407) 505-9836
How long does a kitchen remodel take in Orlando?

Most kitchens run 4 to 8 weeks from demo to walkthrough. Cabinet lead time is the biggest variable, so we order before we tear out.

Can I stay in the house during a remodel?

Usually yes. We seal off the work area, set up a temporary kitchen corner and keep one bath running.

Do you handle permits?

Yes. We tell you up front whether your project needs a permit and how it gets handled.

Can you open up a wall between the kitchen and living room?

Most of the time. We check whether the wall carries load and size a beam if it does.

Free in-home estimate

Plan my remodel.

Bring a photo of the room and a wish list. We bring the tape measure.

Plan my remodel

Same-day callback.

Prefer to talk? Call (407) 505-9836

Where we do this work

Remodeling in 10 cities. Pick yours.

More from Burden

Other services

One crew, all of it.

Call now Free estimate